highlights of our Uganda Project That has been successfully commissioned last year December 2024
Project-Lot1: Engineering, Procurement and Construction of 132KV Mirama-Kabale Double Circuit Transmission Line Project (LOT1) Funded by Islamic Development Bank.
Scope: Construction of 85 KM of double circuit transmission line from Mirama to Kabale
Project-Lot2: Plant, design, supply and installation of LOT 2(220/132/33KV Mirama substation-extension and 132/33KV New Kabale substation) Re-Tender
Scope:
- Extension of 02 nos. 132KV bays at existing 220/132KV substation Mirama, Uganda
- Construction of 132/33kV, New substation at Kable, Uganda with 02X40 MVA, 132/33kV power transformers, 06 nos. 132kV bays and 09 nos. 33KV GIS bays



18 Comments
cialis in store
cialis in store
vidalista uses in hindi
vidalista uses in hindi
sildenafil 50mg price
sildenafil 50mg price
cenforce pill
cenforce pill
orlistat medication online
orlistat medication online
orlistat tablet benefits
orlistat tablet benefits
stendra coupons
stendra coupons
semaglutide injection online
semaglutide injection online
topical dutasteride bangladesh
topical dutasteride bangladesh
semaglutide vs tirzepatide clinical trial
semaglutide vs tirzepatide clinical trial
finpecia 1mg
finpecia 1mg
what happens when you drink alcohol with topamax
what happens when you drink alcohol with topamax
proscar opinie forum
proscar opinie forum
flagyl medication side effects
flagyl medication side effects
can metronidazole treat uti
can metronidazole treat uti
cialis generico online
cialis generico online
acyclovir pills walgreens
acyclovir pills walgreens
liraglutide brand for diabetes
liraglutide brand for diabetes
Comments are closed.